RO plant for landfill Eberstetten

References Deutschland

In October 2015 TDL commissioned a 2-stage reverse osmosis plant at the landfill Eberstetten with a capacity of 100 m3/d. The plant operated at the landfill is TDL’s own and was fitted to the parameters of the site in 2015.

The term for the operational management contract is several years and includes the provision of the plant technology, personnel, repairs and maintenance, as well as the supply of operating materials and consumables.