For more than 10 years and in cooperation with our partner company PS Project Systems GmbH, TDL Energie has successfully serviced the gas engines at the Vorketzin landfill site.
The operator model “Vorketzin Landfill Gas Utilization” comprises a power output of 2.900 kWel.
Starting from 01 April 2015, the contract between MEAB and us was extended.
In addition, TDL Energie was assigned with the maintenance of the booster and gas flare system.